TL;DR (generated, confidence: high)
Portal listing residential permitting forms, guides, and reference documents with update dates, covering permits, septic systems, zoning, and design requirements for Portland residential development.
Key points:
Daily Pre-Issuance List for residential and sign permits (updated April 17, 2026) (Documents ↗ )
Daily Pre-Issuance List for Solar, Mechanical (stand-alone), and Residential Deferred Submittals and Revisions (updated April 17, 2026) (Documents ↗ )
FAR (Floor Area Ratio) regulations define relationship of building area to site area to determine how much building is allowed (Documents ↗ )
Septic systems required for properties without physical/legal access to public sanitary sewer; septic approval and decommissioning permits available (Documents ↗ )
Neighborhood Contact requirement (form last updated 12/03/2020) must be completed before land use review or building permit submission (Documents ↗ )
Residential deck guide provides permit-ready prescriptive plans for design, permitting, and inspection (updated February 3, 2026) (Documents ↗ )
Tree removal form required only when removing trees 36 inches or greater on private property (updated February 5, 2026) (Documents ↗ )
Field Issuance Remodel (FIR) Program maintains list of registered contractors (updated March 10, 2026) (Documents ↗ )
Entities: document: Pre-Issuance List | regulation_concept: Floor Area Ratio (FAR) | program: Field Issuance Remodel (FIR) Program | requirement: Neighborhood Contact requirement | form: Land Use Type III Decision Appeal | reference_document: Erosion and Sediment Control Manual | zoning_designation: Airport Noise Impact Overlay Zone
Home — Intro
← Home
Fee Schedules: Building Permit Costs, Trade Permit Costs and Other PP&D Fees
Source: Fee Schedules: Building Permit Costs, Trade Permit Costs and Other PP&D Fees ↗
Fee-related services include permits for new and altered buildings and their properties, land use reviews, certificates and registrations, inspections, and other compliance services and fees collected for other Portland bureaus.
The following information outlines the individual fees and charges that might be part of your total project cost:
Your project could have fees from several fee tables. For example, a residential addition could have fees from the building permit, site development, plumbing, and electrical fee tables.
System Development Charges and development fees. In addition to System Development Charges ↗ , other City bureaus may charge development fees. Please review their fee schedules below.
Metro Tax. Your project could be affected by Metro Excise Tax ↗ .
Surcharge. For all building, plumbing, electrical, and mechanical permits, a 12% surcharge is applied by the State of Oregon.
Contact the Development Services Center ↗ for the estimated costs associated with your specific project.